Estimated Timeline as of January 2008

The January 2008 Building Project Update is now available for download. You can also find the text of the update below.

January Update in PDF format:

Floor Plans: Click on a thumbnail image to see the larger version

Ground Floor Plan
Ground Floor
First Floor Plan
First Floor
Second Floor Plan
Second Floor

Elevation Drawings: Click on a thumbnail image to see the larger version

West Elevation
West Elevation
North Elevation
North Elevation

Looking at the Estimated Timeline, you can see that we are on schedule and midway through the design process for the new Worship Center. Schematic design plans are included in this months' report, which will give you a better understanding of the design work to date. Detailed construction drawings will follow in April.

Anything change during schematic design? Yes. During the schematic design phase we increased the overall size of the Worship Center by 745 square feet, changed the location of the lobby and placed all new facilities on two floors instead of three. So, for this phase of construction, we will be building 33,245 square feet of space on two floors—Ground and First. Design changes were made in order to better orient the lobby to the main parking area and to realize additional economies by increasing the size of the ground floor rather than build another floor. In the coming years, we can expand to a third floor as balcony and additional classroom space are needed.

What about the budget? The total estimated project budget for 33,245 square feet of new building space is from $11.6 to $12.8 million. This budget includes all design, demolition, construction, permit fees, escalation, contingency and special equipment costs such as a new organ, piano, A/V and lighting systems. To date we are within the budget estimate at $11.6 million.

More information will be presented on the schematic design at the upcoming Radical Connections Family Celebration on February 10th.

Worship Center Project Overview

Ground Floor—9,720 square feet
1 toddler and 2 nursery rooms with 62 person +/- capacity
3 multi-use classrooms with 200+/- person capacity
Entry lobby, restrooms and elevator
First Floor—23,525 square feet
Flat floor Sanctuary with 800+ seating capacity
Lobby including fireplace, coffee station and conversational seating
2 multi-use classrooms with 140+ person capacity
Cry, translation, A/V booth, support, mechanical and storage rooms, restrooms and elevator
Plaza area (approximately 40x250 feet) between existing and new sanctuary with covered walkways, garden landscaping and outside seating
Future Second Floor—10,000 square feet
Balcony with 300+ seating capacity
2 multi-use classrooms with 150+ person capacity
Small lobby, restrooms and elevator