radicalconnections.org

Weekly Prayer Reminder: 3-31-2008

Final construction drawings are in full swing with some minor changes occurring along the way. As you may recall, we will be constructing 3 floors: Lower Level with childcare and 3 multi-use classrooms; Main Floor with sanctuary seating for 800-1000 persons, 2 multi-use classrooms, a big lobby with coffee/tea bar, a lounge and fireplace; and a 3rd Floor with over 10,000 square feet of expansion area. We will also be developing an outdoor Plaza with covered walkways, water features, landscaping, tables and seating.

The remaining project schedule—which will take us to groundbreaking—is as follows:

Also, some very important—yet mundane—permits are now being processed by Clean Water Services, Washington County and the City of Beaverton: Erosion Control and 1200-C; Grading Permit; and Temporary Use Permit for relocating the portable offices. The Demolition Permit application is now being prepared by Group Mackenzie Architects and should be submitted to Washington County in the next 2 weeks.

This week, please pray that we continue to find ways to mesh the final design pieces together, meet our project schedule and obtain the necessary permits.

Tighten your seat belt...

Dale
Matthew 6:34